Builders quote checker

Most building disputes start with something the quote never mentioned. Go through your quotes and tick each line they cover. You can compare up to three side by side. Anything left unticked is a question to ask before you sign.

By Martynas Vaitaitis, Builder & Project Manager at Vayton. Checked 21 November 2026.

Your quotes

Get it priced

Your answers go with the enquiry. Our visit is free, with no obligation.

Builders quote questions

What should a builders quote include?

The work room by room, the materials or PC sums, prelims, strip-out and waste, making good, services, building control, VAT, payment stages, a start date and how long the price holds. The checklist above covers each one.

Should a builders quote be itemised?

Yes. An itemised quote lets you compare builders line by line and agree changes without arguing about what was included. A single total with no breakdown is hard to hold anyone to.

Why do some builders quote without VAT?

Firms with turnover under the VAT threshold don't charge it. Others show the price before VAT and add 20% at the bottom. Compare quotes on the same basis, either both with VAT or both without.

What if a builders quote seems too high?

Check what it covers before comparing totals. The cheaper quote often leaves out prelims, making good or decorating, and those come back as extras. Ask each builder to price the same list.

Is a quote the same as an estimate?

No. A quote is a fixed price for the work described. An estimate is a best guess that can change. Ask for a written quote and make sure it says it is one.

More free tools

All free tools

Free visitOur engineer measures or surveys for free, with no obligation to order.

Price in writingAfter the visit we fix the price in writing before any work starts.

Insured£10m public liability insurance. References on request.

See the workProjects · Houzz · Facebook