By Martynas Vaitaitis, Builder & Project Manager at Vayton. Checked 21 November 2026.
All 59 terms, A to Z
- Architrave
- The moulded trim round a door frame or window opening that covers the joint between the frame and the wall. It goes on at second fix, after plastering. Read more
- Article 4 direction (Article 4)
- A council order that removes some permitted development rights in an area, so work that would normally need no application, such as new front windows or paving a front garden, needs planning permission. Councils publish their Article 4 directions. Read more
- Asbestos survey
- A survey that finds asbestos before building work disturbs it. Before refurbishment the right type is what HSE calls a refurbishment or demolition survey, covering the area of the work, including material hidden in the walls, floors and ceilings. Read more
- BIM (building information modelling)
- A shared 3D model of a building that holds the drawings and product data in one place. It is common on large commercial jobs and rare on house extensions. Read more
- Build over agreement
- Permission from the water company to build within 3 metres of a public sewer. Many London extensions need one, because shared sewers often run behind terraces. Read more
- Building control
- The check that work meets Building Regulations: structure, fire, sound, drainage, insulation and more. You pay the council or a registered building control approver, and you get a completion certificate at the end. Read more
- Building notice
- One of two ways to apply to council building control. Work can start 2 days after it is given, but nothing is approved in advance. The other route, full plans, has the drawings approved before work starts. Read more
- Building regulations
- The legal standards for building work in England, covering structure, fire safety, insulation, ventilation, drainage, sound and more. The Approved Documents explain how to meet them, and building control checks the work. Read more
- Bulkhead
- A boxed-down section of ceiling that hides ducts, pipes or a steel beam, usually framed in metal and boarded. Read more
- BWIC (builder's work in connection)
- The building work other trades need so they can do theirs: holes through walls for pipes, chases for cables, boxing in, and access hatches. On a quote it is often a single line, so ask what it covers. BWIC is also a bond-market term; on a building quote it always means this. Read more
- Cat A and Cat B
- Office fit-out stages. Cat A is the landlord's base: ceilings, lighting, raised floors, air conditioning. Cat B is the tenant's layout: meeting rooms, kitchens, finishes. Read more
- Completion certificate
- The certificate building control issues when it is satisfied the finished work meets building regulations. Keep it with the deeds, because a buyer's solicitor will ask for it. Read more
- Conservation area
- An area the council protects for its special character. Some permitted development rights do not apply there, and councils often add Article 4 directions. A large part of inner London is in one. Read more
- Daywork
- Work charged at an hourly or daily rate plus materials, rather than a fixed price. It should be recorded on a signed daywork sheet each day. Read more
- Deflection head
- A gap and sliding track at the top of a partition that lets the floor above sag slightly without cracking the wall. When a partition runs up to a concrete slab, we leave the gap the structural engineer gives and check it before boarding. Read more
- Dormer
- A box-shaped roof extension that adds full-height floor space to a loft. A rear dormer is the most common London loft conversion. Read more
- Dot and dab
- Fixing plasterboard straight to a masonry wall with blobs of adhesive instead of a frame. When we take over an old dabbed wall, the usual fault is too few dabs, which leaves hollow boards. Read more
- Engineered wood
- Flooring with a real wood top layer bonded to layers of plywood or softwood beneath. It moves less than solid wood and is laid floating or glued, depending on the product. Read more
- EPC (energy performance certificate)
- A rating from A to G for how energy efficient a building is. It is needed to sell or let a property. Commercial landlords need at least an E to let most premises. Read more
- First fix and second fix
- First fix is everything that goes in before walls are closed: pipes, cables, back boxes, door linings. Second fix is what goes on after plastering: sockets, taps, doors, skirting. Read more
- Hip to gable
- A loft conversion that rebuilds a sloping end roof (the hip) as a vertical wall (the gable) to make room for stairs and headroom. Read more
- Lath and plaster
- The wall and ceiling finish in most pre-1930s houses: lime plaster pushed onto thin timber strips. It cracks and sags with age. Read more
- Lawful development certificate
- A council document confirming work is permitted development, so it did not need planning permission. It costs half the planning fee and helps when you sell. Read more
- Licence to alter
- A landlord's written permission for a leaseholder or commercial tenant to change the property. Needed before work starts in most flats and shops. Read more
- Lintel
- A beam over a door or window opening that carries the wall above. In older houses it may be timber or brick; new ones are usually steel or concrete. Read more
- LVT (luxury vinyl tile)
- Vinyl flooring made as planks or tiles with a printed wood or stone look under a clear wear layer. It needs a smooth, level subfloor, because bumps show through. Read more
- Making good
- Repairing and finishing surfaces after other work: filling chases, patching plaster around new sockets, putting back skirting. Ask whether it is in the price or left to you. Read more
- Mansard
- A roof extension with a near-vertical back slope, common on London terraces. It nearly always needs full planning permission. Read more
- MF ceiling
- A suspended ceiling frame of light steel channels (MF stands for metal furring) hung from the structure and boarded with plasterboard. Read more
- Mist coat
- A thinned first coat of emulsion on new bare plaster. The plaster soaks it in, which gives the next coats something to grip. It goes on only once the plaster is dry. Read more
- Noggins
- Short horizontal pieces fixed between studs. They stiffen the wall and give something solid to fix boards, shelves or radiators to. Read more
- Padstone
- A block of concrete or engineering brick built into a wall under the end of a steel beam, so the load spreads over the wall instead of bearing on one point. The structural engineer sets its size. Read more
- Party wall award
- The document surveyors agree under the Party Wall etc. Act 1996 when a neighbour dissents to a notice. It sets out how and when the work is done and records the neighbour's property before work starts. Read more
- Party wall notice
- The written notice you serve on neighbours before work on or near a shared wall. Most need one or two months' notice. Our free notice builder writes it for you. Read more
- Pattressing
- Plywood or timber backing fixed inside a stud wall where something heavy will hang. We fix plywood backing wherever a TV, cabinets or a basin will go. Read more
- PC sum (prime cost sum)
- An allowance in a quote for an item you have not chosen yet, such as tiles at £40 per m². If you pick dearer tiles, the difference is added. Read more
- Permitted development
- Work you can do without a planning application, within size limits set by government. Most loft conversions and many rear extensions qualify. Flats and conservation areas have fewer rights. Read more
- Planning permission
- Consent from the council for building work or a change of use. Many house extensions and loft conversions need none because they are permitted development; flats, conservation areas and larger work usually do. Read more
- Plasterboard
- Sheets of gypsum between paper faces, used to line walls and ceilings. The usual sheet is 2400 by 1200 mm in 9.5, 12.5 or 15 mm, with special boards for fire, sound and moisture. Read more
- Prelims (preliminaries)
- The cost of running the site rather than building anything: scaffold, skips, toilets, protection, supervision and cleaning. Read more
- Prior approval
- A quick council check for larger single-storey rear extensions under permitted development. Neighbours are told and can object. Read more
- Provisional sum
- A sum for work that can't be measured yet, such as repairs behind a wall nobody has opened. It is adjusted to the real cost once the work is done. Read more
- Registered building control approver
- A private firm you can use for building control instead of the council. These firms were called approved inspectors until 2024. They check the work against Building Regulations and issue the completion certificate. Read more
- Regularisation certificate
- Retrospective building control sign-off for work done without it. The council inspects, which can mean opening up finished work. Read more
- Render
- A coat of sand and cement, lime or a ready-mixed coloured render applied to outside walls to protect and finish them. Cold, frost and rain while it cures can spoil it. Read more
- Resilient bars
- Thin metal strips that hold plasterboard slightly away from joists so less sound passes through a ceiling. We have fitted resilient bar ceilings in flats, and they passed their sound tests. Read more
- RFI (request for information)
- A written question from the builder to the designer when the drawings or specification leave something unclear. Answers are logged so changes can be priced. Read more
- Schedule of works
- A room-by-room list of the work to be done. Builders price against it, so every quote covers the same thing. Read more
- Section 20
- The consultation a freeholder must run with leaseholders before major works that would cost any one of them more than £250. Read more
- Skim
- A thin finishing coat of plaster, about 2 to 3 mm, over plasterboard or sound old plaster. Read more
- Skirting (skirting board)
- The board along the foot of a wall that covers the joint with the floor and takes knocks. It is usually MDF or pine and goes on at second fix. Read more
- Snagging
- Listing and fixing small faults at the end of a job before the final payment. Read more
- Soil stack
- The large vertical pipe that carries waste from toilets down to the drain, usually vented above the roof. A toilet needs a short, falling route to it, which is why moving a toilet is harder than moving a basin. Read more
- Steel beam (RSJ)
- A steel beam that carries the wall, floor or roof above a new opening. RSJ stands for rolled steel joist. A structural engineer sizes it and building control checks it. Read more
- Stud wall
- A wall built from a frame of timber or metal studs covered in plasterboard. Studs normally sit at 600 mm centres. Read more
- Tanking (waterproofing)
- A waterproof layer, liquid or sheet, put on walls and floors before tiling in a shower or wet room, so water cannot reach the board or plaster behind. Read more
- Tape and joint
- Finishing plasterboard by taping and filling only the joints and screw heads, instead of skimming the whole wall. Read more
- Tender
- The stage where several builders price the same drawings and schedule of works, so their prices can be compared like for like. Read more
- Variation
- A change to the agreed work after the contract starts. It should be priced and agreed in writing before it is done. Read more