+44 7346 816064Request a quotation

Builders’ work & making good in London

Building work around electrical, plumbing and ventilation installations needs clear boundaries and the right sequence. We welcome builders’ work in connection (BWIC) enquiries from main contractors, building-services contractors and property owners across London.

Quick answer

In construction, making good means repairing and reinstating the finishes disturbed by other work, such as openings cut for pipes, cables or ducts, so walls and ceilings are returned to the agreed finish. Builders’ work in connection (BWIC, sometimes written builderswork) is the general building work that supports those installations: forming openings, boxing in services, fitting access panels and making good afterwards.

Boarded partition corner below ventilation ducts and pipework at IQ Nursery, Ealing.
New partitions boarded up to the ducts and pipes above. IQ Nursery, Ealing. Vayton project.

Define the work around the installation

A services contractor may need access through existing finishes, new boxing, ceiling alterations or making good after installation. List each location and the required finish, because a single allowance for all builders’ work hides the differences. The drawings and quotation should separate access work from the specialist installation itself.

Coordinate before closing up

Confirm when the services will be installed, inspected and ready for enclosure. Agree who authorises closure, the access panels needed for maintenance and any supporting or backing details. Ceiling grids, board edges and retained finishes should be coordinated with the other trades so the reinstatement scope is clear.

Price the specified system

Where a wall or ceiling has specified fire or acoustic performance, send the relevant system details and responsibilities for penetrations and sealing. Structural openings, service isolation, specialist fire-stopping, testing and certification are included only if expressly agreed as part of a suitable package. Do not assume a making-good quotation covers these appointments.

Information for a trade-package quotation

Send marked-up drawings, quantities, wall and ceiling types, opening and access-panel details, finish requirements and the programme. Confirm labour-only or supply-and-fit, access equipment, waste arrangements and work by others. Tell us about any return visits needed after testing or later installation.

Before you enquire

Can you work alongside our M&E contractor?

Yes. Send the installation programme and the builders’ work schedule so we can discuss interfaces and release dates.

Do you offer labour-only packages?

We can discuss labour-only or supply-and-fit. The quotation must say who provides materials, equipment, supervision and disposal.

Does making good include the whole room?

Only the agreed extent. Local repairs, full-surface preparation and complete redecoration are different scopes and should be listed separately.

What is the difference between builders’ work and making good?

Builders’ work in connection covers the building tasks an installation needs, such as openings, boxing and access panels. Making good is the reinstatement afterwards: board repairs, plastering and decoration to the agreed extent. Both are easier to price when each location is listed with its required finish.

Does making good include fire-stopping or certification?

Not unless it is expressly agreed. Where a wall or ceiling has specified fire or acoustic performance, send the system details and the responsibilities for penetrations and sealing. Specialist fire-stopping, testing and certification need their own suitable appointment.

Tell us about your project.

Send your postcode, the work you need and your preferred timing.

Request a quotation
Chat on WhatsApp