Offices & workplaces
Layout changes, partitions, ceilings and finishes planned around staff, access and occupation.
Office refurbishmentVayton Construction provides commercial fit-out and refurbishment packages for offices, nurseries, shops and hospitality premises across London. Our agreed construction scope can include internal alterations, drylining, partitions, ceilings and finishes. Speak directly with us about your drawings, access, specialist trades and handover date.
Request a quotation · See our nursery drylining work








A defined drylining package within the nursery fit-out in Ealing. The photographs show Vayton’s metal-stud partitions, backing and arched openings at first fix. Our case study follows the work into the phase-two boarding and ceiling stages recorded on 22 October 2026.
A vacant unit, an occupied office and a trading venue need different work sequences. Tell us your opening or handover date, which areas must stay usable, delivery arrangements and permitted hours. Phasing and out-of-hours work can be discussed for your premises, and we agree disruption, access and protection before a programme is fixed.
Commercial work may involve a landlord, designer, operator, main contractor and specialist building-services installers. Drawings and a scope schedule should show who designs, supplies, installs, tests and makes good each item. Our quotation defines the agreed construction package, inclusions and exclusions. Specialist systems and approvals are not assumed to be part of it.
Send the premises postcode, plans or photographs, existing and proposed room uses, finish schedule, approximate quantities and desired dates. Include access rules, occupied areas, landlord requirements, material storage and any work by other trades. If you need labour-only or supply-and-fit, state what each party will provide.
Request a quotationThat depends on the areas and works involved. Send us your trading hours and the spaces that must stay operational, so we can review separation, access and any practical phasing before a programme is agreed.
Yes. Send the latest revisions, quantities and scope boundaries. Point out undecided finishes, client-supplied items and work by specialist contractors so assumptions and provisional items are visible.
Design and specialist approvals are not automatically included in our construction package. The quotation identifies the agreed work and any additional appointments. Confirm who provides the drawings, specifications and approvals, and who installs and tests specialist systems, before the work is scheduled.
The quotation should identify preparation, strip-out, partitions, ceilings, finishes and making good where these are part of the agreed package. It should also list supply responsibilities, access arrangements, exclusions and provisional items. Equipment, furniture and specialist installations need their own clear scope.
Commercial fit-out cost depends on the premises, specification and construction package. A decorating refresh and a fit-out with new partitions, ceilings and building services need different budgets. Compare the same scope, measured floor area, supply responsibilities and VAT treatment. Our commercial refurbishment cost guide explains what to include in the brief.
Read the commercial refurbishment cost guideWe review the scope, access hours, occupied areas, material lead times and work by other contractors before agreeing the sequence. Tell us your opening or handover deadline when you enquire. The programme has to allow for service interruptions, finishes, snagging and handover as well as installation.
Planning work around opening hoursSend the premises postcode, current drawings or photographs, required works and target handover date. Include your budget range if available, occupied areas and any landlord access rules so we can review a practical package.
Request a quotation