How much does planning permission cost in London?

Planning permission for a house extension in London costs £548 in council fees from 1 April 2026, the same in every borough, rising to £575 from 8 December 2026 if Parliament approves the new fees. Drawings, surveys and party wall agreements usually cost more than the fee, and councils normally decide within 8 weeks.

November 6, 2026

Read the guide ↓

Prepared by Vayton Construction Ltd

Diagram of two planning routes drawn to the same scale: a householder application is sent, validated, then decided within 8 weeks; prior approval for a larger single-storey rear extension is decided within 42 days. Missing documents stop the clock.

Diagram: decision times for a householder application and for prior approval of a larger rear extension, drawn to the same scale. The time to validate an application varies.

Planning application fees for 2026 and 2027

These are the fees in England for the applications most homeowners make. The first column is the fee from 1 April 2026, and the second is the fee the Planning Portal lists from 8 December 2026, based on draft regulations still waiting for Parliament's approval.

ApplicationFrom 1 April 2026From 8 December 2026, if approved
Householder application to extend or alter a house£548£575
Garden outbuildings, gates, fences or walls£272£285
Prior approval for a larger single-storey rear extension£249£310
Prior approval for adding storeys to a house£249£310
Lawful development certificate for proposed workHalf the planning fee, so £274Half the planning fee
Discharging a planning condition£89£125
Non-material amendment£46£53

The current figures come from the government's fee schedule from 1 April 2026, which raised fees by 3.8 per cent in line with inflation. Fees normally rise again every 1 April. Householder applications cover houses only. Flats and maisonettes need a full planning application instead, but altering a single flat costs the same £548, or £575 from 8 December 2026 if approved. The Planning Portal adds a service charge for some online submissions. We checked every figure here against gov.uk and the Planning Portal on 6 November 2026.

Do you need planning permission at all?

Many single-storey rear extensions and loft conversions on houses fall under permitted development and need no planning application. A larger single-storey rear extension needs prior approval instead, and the council has 42 days to decide it. A lawful development certificate is optional, but it proves the work was allowed, which helps when you sell.

London has more exceptions than most places. Flats have no permitted development rights for extensions, many streets are in conservation areas, and some boroughs use Article 4 directions to remove permitted development rights. In any of those cases you need to apply: a householder application for a house, or a full application for a flat. Mansard roofs and most two-storey extensions need permission too.

The other costs of getting planning permission

  • Drawings and design. Design and engineering typically add 15 to 20 per cent to the construction cost, as our house extension cost page shows.
  • Surveys. A measured survey gives accurate drawings, and a drain survey before an extension can stop a redesign once the ground is open.
  • Extra reports. In a conservation area the council may ask for a heritage statement, and trees near the work can need a tree report.
  • Party wall agreements. A party wall surveyor typically costs £600 to £2,000 per neighbour.
  • Building control. This is separate from planning and is needed whether or not you need planning permission. Fees vary by council.

How long does planning permission take?

Councils normally have 8 weeks to decide a householder application once it is validated, and 42 days for prior approval of a larger rear extension. Missing drawings or documents stop the clock until they arrive, so a complete application is the quickest route.