+44 7346 816064Request a quotation

Accessible bathrooms and wet room installation in London

We welcome enquiries for wet room installation, bath-to-shower conversions and more accessible bathrooms across London and surrounding areas. We agree the building work around your layout, your chosen fittings and the existing floor, and we look at drainage, waterproofing and access before quoting.

Request a quotation
Illustration of a stainless steel grab rail, anti-slip floor tile samples and a thermostatic shower valve.
Illustration of a grab rail, anti-slip tile samples and a shower valve. Not a photograph of a Vayton project.

A layout shaped around everyday use

Start with the changes that would make the room easier to use: entering the shower, reaching controls, moving around fittings or leaving space for assistance. If you already have an occupational therapist’s recommendations or an accessibility designer’s plan, send them with your enquiry.

Positions for seats, rails, controls and sanitaryware need agreeing for the intended user and the chosen products. The construction package should show backing and fixing requirements before walls are finished. Tell us the practical requirements. You do not need to send medical records to request a building quotation.

Walk-in showers, wet rooms and level access

A walk-in shower can use a shower tray. A wet room has a waterproofed shower floor with falls towards the drain. Neither description alone confirms a step-free entrance. Floor construction, available depth and the waste route determine the options. In a flat, the building’s requirements and access to shared services also need checking.

We need a site assessment and suitable design information before confirming a level-access arrangement. If it cannot be achieved within the existing floor, the design may need an alternative solution or a wider scope. Structural alterations and specialist service changes need the appropriate input.

Bath-to-shower conversion: compare the work and cost

Replacing a bath with a shower can mean fitting a tray within the old bath area or rebuilding the shower floor as part of a wet room. A walk-in shower describes the open access arrangement, and it can use either approach. Compare the construction needed beneath the finish before choosing fittings.

Shower tray in the existing bath area

The scope can include bath removal, checking the exposed floor and walls, fitting a supported tray, adapting the waste and water connections, waterproofing the specified wet areas, wall finishes and a screen. Check the tray, waste and pipe route together before confirming the finished entry height.

Removing the bath may expose untiled or damaged areas. Agree how new tiles or wall panels will meet retained finishes, and whether matching products are available.

Wet room floor

The quotation should state the floor former or other specified build-up, falls, compatible drain, waterproofing system and floor finish. Establish how much of the room needs preparation and tanking, including junctions, penetrations and the doorway detail.

Available floor depth and the drainage route affect feasibility. A level entrance may need a wider floor or service alteration, and it should be confirmed from the actual construction and design.

Keep these items separate in the quotation

  • Bath removal, waste disposal and investigation of concealed damage.
  • Floor and wall preparation, drainage changes and the specified waterproofing work.
  • Tray or former, shower fittings, screen, tiles and installation materials, with a named supplier for each.
  • Tiling, decoration, ventilation, electrical work and any seat or rail backing.

Keeping connections in similar positions can limit some alterations, but it does not confirm that the existing waste or floor is suitable. Compare quotes against the same layout and products, and plan temporary facilities if this is your only bathroom.

Use the bathroom fitting cost guide for a wider budget checklist. Its whole-bathroom benchmarks are not bath-to-shower conversion prices. Manufacturer guidance from Impey on shower trays and drainage explains why the chosen product and floor arrangement matter.

Request a quotation

Waterproofing, drainage and suitable finishes

The wet area needs a coordinated system of floor preparation, drainage, waterproofing and compatible finishes. Junctions, penetrations and the transition to the surrounding room should follow the agreed system and manufacturer’s requirements. Tiles and grout alone are not a complete waterproofing solution.

Talk to us about floor finishes suitable for the intended wet use, cleaning requirements and the chosen fittings. The quotation should separate removal, preparation, plumbing, waterproofing, fitting and final finishes, with electrical and ventilation work assigned to the relevant specialists.

Plan access to essential facilities

Tell us if this is the only bathroom or toilet and whether the home will be occupied. Removal, service changes and product curing times can leave facilities unavailable. We need to discuss access arrangements and any temporary alternatives before the programme is agreed.

We can consider client-supplied fittings where dimensions, fixing details and delivery dates are available. Agree who checks compatibility, orders each item and deals with missing parts. We review projects across North, South, East, West and Central London and surrounding areas.

General bathroom refurbishment

Accessible bathroom questions

Can you replace a bath with a walk-in shower?

A bath-to-shower conversion may fit within the existing bath area, but the waste route, water supply and condition behind the old fittings need checking. Compare a suitable low-profile tray with a wet room floor before choosing. A flush entrance is not possible in every floor without further work. Send room dimensions, photographs and your preferred fittings so we can discuss the scope.

Do I need an occupational therapist’s plan?

If you have recommendations, send them so the construction follows the agreed brief. Where the layout must meet particular mobility or care needs, appropriate professional advice can help establish the requirements. Our quotation covers the agreed building work.

What affects wet room and walk-in shower costs?

A shower replacement that keeps existing connections is a different scope from a full wet room installation. Compare removal and waste disposal, floor preparation, drainage changes, waterproofing, tiling, fittings and decoration separately. Confirm who supplies the products and whether electrical or ventilation work is included. Access, hidden repairs and keeping your only bathroom usable can also affect the quotation, and a price per square metre alone will not show these differences.

Plan a bathroom that works for you

Send your postcode, photographs and a short description of the changes you need. Include a plan or product choices if available, and tell us which facilities must remain accessible.

Request a quotation
Chat on WhatsApp