Commercial refurbishment costs per m² in London

A commercial refurbishment rate per m² can only be compared when you know which floor area it covers and what the price includes. The worked 60 m² example and the cost table below show how area, supply responsibilities and exclusions change the figure, whether the unit is an office, a shop, a café or a nursery. For a full office fit-out priced per sq ft, see our office fit-out costs in London.

Prepared by Vayton Construction Ltd · 28 September 2026 · Updated 10 November 2026

Jump to the London cost benchmark table

The starting condition

A light refresh of sound surfaces differs from a strip-out that reveals damaged backgrounds or services that need alteration. Existing drawings, a site review and clearly recorded assumptions help define the starting point. Some hidden conditions only show up after opening up, so the quotation should explain how uncertain items are treated.

How much the layout changes

Moving partitions can affect ceilings, flooring, lighting, ventilation and other installations. Relocating a kitchen, washroom or service counter may involve work beyond the visible fittings. Use the proposed layout to identify these connections early, and make clear which designer or specialist is responsible for the supporting information.

Specification and finish

Board systems, ceiling types, floor finishes, joinery and decorating requirements influence both materials and installation time. Preparation matters: a local patch and full-surface preparation are different packages. An agreed finish schedule allows contractors to price the same work and helps prevent later selections from changing the budget unexpectedly.

Building services and equipment

Separate the building work from equipment, furniture, IT, extraction and other specialist installations. Ask whether each is included, excluded or supplied by you. Identify the builders’ work needed around those installations, including openings, boxing, access panels and making good. A complete equipment budget is not automatically part of an interior-refurbishment quotation.

Access, working hours and phasing

Restricted deliveries, upper-floor access, limited storage and short working windows affect how a job is organised. Keeping part of a business open can require separate phases, additional protection and return visits. Talk through whether a short closure or a phased approach is practical. Neither is always cheaper.

Allowances and changes

List provisional items and the basis of any allowance. Keep work included in the agreed price separate from additional work that may become necessary. Request the price and programme effect of a proposed change before authorising it where practicable. Set a contingency based on the uncertainties of your own project, and do not copy one from an unrelated job.

How to get a meaningful comparison

Give each refurbishment contractor the same drawings, work schedule, access information and supply list. Compare the construction totals, then add client purchases and separately appointed work once. Check VAT, waste, specialist visits and handover requirements on the same basis. Ask which allowances could change and what further information would turn them into a confirmed price.