Turning a conservatory into an extension: roof, rebuild or replace

November 17, 2026

There are three ways to go from conservatory to extension standard: replace the glass roof with a solid one, rebuild it as a proper extension on the same footprint, or take it down and build a new extension. A solid roof needs building regulations approval, and so does opening up the wall to the house. A new extension follows the normal planning rules.

November 17, 2026

Read the guide ↓

Prepared by Martynas Vaitaitis, Builder & Project Manager

Diagram of three options for a conservatory, each against the back wall of the house: a new solid roof on the existing frame, a rebuild on the same footprint, and a new larger extension.

Diagram: three ways to turn a conservatory into a year-round room. Not to scale.

Conservatories are cold in winter and hot in summer because the roof and most of the walls are glass. Turning one into a room you use all year means changing that. The choice is between a new solid roof on the existing structure, rebuilding on the same footprint, or replacing it with a new extension. The rules below apply in England.

Why are conservatories usually exempt from building regulations?

Because of how they are built and separated from the house. The Planning Portal says a conservatory is normally exempt when it is at ground level and under 30 square metres, single storey, separated from the house by external quality walls, doors or windows, and has its own heating with separate controls, with the glazing and any fixed electrics meeting the regulations. The same page warns that "any new structural opening between the conservatory and the existing house will require building regulations approval, even if the conservatory itself is an exempt structure".

That exemption matters for the conversion, because most of the changes people want, a solid roof, the wall knocked through, the house heating extended, take the conservatory out of it.

Do you need building regulations to put a solid roof on a conservatory?

Yes. LABC says that "if you intend to replace your translucent roof with a new solid roof you’ll need to submit a building regulations application". Its guidance for homeowners adds that building control will inspect the existing conservatory "to ensure it can take the additional load of the new roof", and that the new roof and its supporting structure must comply with the regulations. In practice the checks are:

  • whether the frame, dwarf walls and foundations can carry the heavier roof, which is the point where many conservatories fail, because their foundations were often shallow
  • the new roof’s insulation, which as a new roof element should meet 0.15 W/m²K under Approved Document L
  • weathering at the junction with the house wall
  • ventilation and condensation in the new roof

Some lightweight roof systems have LABC registered details, which give building control an approved design to check against. The rest of the conservatory, the glazed walls and the floor, does not have to be upgraded, but it stays as it was: a room with glass walls.

What does rebuilding on the same footprint involve?

The conservatory comes down and an extension is built in its place, with insulated walls, a proper roof, windows and doors. It is the option that gives a room built to the same standard as the house. It is also the point to decide whether the footprint is right. The rebuild is a new extension, so:

  • it needs building regulations approval like any extension, with foundations dug to suit the ground and nearby trees and drains
  • it needs planning permission, or must fit within permitted development
  • new walls need to meet 0.18 W/m²K, the roof 0.15 W/m²K and the windows 1.4 W/m²K under Table 4.2 of Approved Document L

Does replacing a conservatory with an extension need planning permission?

It follows the same rules as any extension. The Planning Portal says a conservatory "falls within the same set of planning rules as any other home extension". If the new extension stays within the permitted development limits, such as 3 metres beyond the original rear wall of a terraced or semi-detached house and 4 metres for a detached house, it needs no application. The limits are measured from the rear wall of the original house, so once the old conservatory is taken down the new extension is measured in the usual way. Our permitted development guide covers the limits in full.

Can you keep the dwarf walls and foundations?

Sometimes, but only after they are checked. Conservatory dwarf walls are often a single skin of brick on a shallow strip foundation, built for a light frame. An extension with a heavier roof and insulated cavity walls usually needs deeper foundations. Building control will want to see them, which means digging a trial hole next to the existing footing. If they are not adequate, the cheaper option in the long run is usually to take them out and start again.

What about the wall between the house and the conservatory?

Opening it up is a structural alteration. The existing back wall of the house holds up the floor or roof above, so a wide opening needs a steel beam designed by an engineer and building regulations approval. Our structural alterations page covers wall removal. If the wall stays with a door in it, the old opening is usually fine as it is.

Which option suits which conservatory?

SituationOption that usually fits
Sound frame, good foundations, mainly a heat problemSolid roof, with the frame and foundations checked first
Old frame, leaking roof or failing sealsRebuild on the same footprint
Wrong size or shape for the room you needTake down and build a new extension
Wall to the house to come down for an open plan roomRebuild or new extension, with the opening designed at the same time

Will a conservatory with a solid roof be warm in winter?

Much warmer than under glass. A solid roof stops most of the heat loss and the summer overheating through the top, which is where a glass roof loses most. The walls are still mostly glass, so the room stays cooler than the rest of the house in winter and the glazing can show condensation. If the existing double glazing is old, its seals may already have failed. Ask for the U-value of the existing frames as well as the new roof before deciding.

Can the house heating be extended into the conservatory?

Not without losing the exemption. The Planning Portal lists an independent heating system "with separate temperature and on/off controls" as one of the conditions for a conservatory to be exempt from building regulations. Running a radiator off the house boiler, or removing the doors between the house and the conservatory, makes it part of the house, and then it has to meet the regulations as an extension. That is often the point at which a rebuild becomes the better choice.

What does a conservatory conversion involve on site?

For a solid roof: the frame and foundations are checked, the old roof comes off, the new roof structure, insulation and covering go on, and the inside is lined and plastered. For a rebuild or a new extension: the conservatory comes down, trial holes check the ground and any drains, new foundations go in, then walls, roof, windows and the opening into the house. If a public sewer runs close by, a Thames Water build over agreement may be needed before the foundations are dug.

Checked against the Planning Portal and LABC on 17 November 2026.