Dry lining is fixing plasterboard to a wall or ceiling instead of covering it with wet plaster. The boards go onto the masonry with adhesive dabs, onto timber battens or onto a light metal frame, and their joints are then taped and filled or the whole face is given a thin skim. A dry lined wall can be decorated within days. A wall plastered from bare brick has to dry out first, which Dulux puts at up to four weeks.
The same word covers the trade more broadly. A dry liner, or dryliner, builds stud partitions and plasterboard ceilings as well as lining existing walls. Our IQ Nursery case study in Ealing follows one of those jobs, from the metal framing to the boarded partitions. This guide explains each method, how dry lining compares with plastering and what we check before a board goes up. British Gypsum makes the boards we fit on most jobs, so the figures here follow its published guidance, read on 21 November 2026.
The three ways to dry line a wall
The method depends on how flat and dry the wall is, how much room you can give up and what will hang on it. Each one leaves a gap behind the board, which is wider for each method in turn:
| Method | How it works and when it suits |
|---|---|
| Dot and dab | Board bonded to brick, block or concrete using blobs of gypsum adhesive, leaving a 10 to 25 mm gap. The quickest and thinnest lining, for a dry wall that is reasonably flat. |
| Timber battens | Treated timber battens fixed to the wall, with the board screwed to them. The batten depth sets the gap, which can carry cables and insulation and can be packed out to straighten a bowed wall. |
| Metal frame lining | Metal channels held off the wall on brackets, with a 25 to 125 mm cavity. For walls that are badly out of plumb, or too poor for adhesive to hold. |

Dot and dab
British Gypsum calls its version DriLyner Dab. The dabs go on in columns, with a continuous ribbon of adhesive along the base, near the top and around every opening and socket so air cannot move behind the board. Our dot and dab guide gives the full pattern and how much adhesive a wall takes.
On old dabbed walls we take over, too few dabs is the usual fault. The board sounds hollow when tapped, flexes when pushed and can crack along its joints.
Timber battens
Battens suit an uneven wall that adhesive alone cannot bring into line, and a wall that needs a gap for cables. Xtratherm's fixing guide for its insulated boards on battens puts the battens at no more than 600 mm centres, with screws every 150 mm, at least 12 mm in from the board edge and 25 mm into the timber. Other boards differ, so check the maker's instructions for yours.
Metal frame lining, such as GypLyner
British Gypsum's metal lining is GypLyner. In the linings chapter of its White Book, GypLyner Universal holds lining channels off the wall on brackets at 800 mm vertical and 600 mm horizontal centres. One bracket gives a cavity of up to 75 mm and a longer one up to 125 mm. British Gypsum describes it as the system for a wall that is very uneven or out of plumb, or a background not suited to bonded linings. Its GypLyner IWL lining stands free of the wall altogether, with a cavity of at least 60 mm.
Pipes and conduits go in the cavity, but the White Book says they have to be fixed in place before the framing starts. Long runs of lining may also need cavity barriers under the Building Regulations.
Dry lining or plastering: which is better?
It depends on the wall and the timetable. Dry lining is quicker and drier and can hide a poor wall. Plaster applied straight to the masonry makes a harder, solid face with no gap behind it. The choice usually comes down to these points:
| Question | How they compare |
|---|---|
| Time before decorating | A taped and jointed wall can be painted once the joints are dry. Dulux reckons plaster on bare masonry needs up to four weeks to dry out. |
| Uneven or bowed walls | Battens and metal frames take out large bumps. Plaster can only build up so much in one coat. |
| Space | Dry lining takes more room: the board plus a 10 to 25 mm gap on dabs and more on battens or a frame. Plaster stays close to the wall. |
| Insulation and cables | The gap can hold cables and pipes, and insulated board can go straight on. Plaster needs chases cut for every cable. |
| Heavy fixings and knocks | Board needs backing or the right fixing for heavy items. A plastered masonry wall takes a plug almost anywhere. |
On a period house with lath and plaster or soft lime plaster, repair or replacement is its own decision. Our lath and plaster guide covers how to tell what you have, and when to repair it or board over it.
Does dry lining need plastering?
No. Tapered edge board is made to be taped and jointed, so only the joints and screw heads are filled before a primer and paint. Others have the whole wall skimmed instead. The tape and joint or skim guide sets out how to choose. Jointing needs the room kept above 5 °C while it dries.
Insulated dry lining on outside walls
Insulated plasterboard, a board with a layer of foam insulation bonded to the back, can go on with dabs, battens or a frame to make a cold solid wall warmer. Two cautions come from British Gypsum's guidance. The wall must be free from damp before any lining goes on. And for internal insulation on solid masonry, it now recommends getting specialist advice on condensation and moisture in the wall first, following BS 5250. On an older London house with solid brick walls, that check is worth doing before the boards are ordered. Our plasterboard sizes guide lists the insulated board thicknesses.
Dry lining ceilings
Ceilings are dry lined in the same way, either fixed straight to the joists or hung below them on a metal grid. On ceilings fixed to joists we normally use 15 mm board. A grid suits a level ceiling under an uneven floor, a bulkhead or a drop to hide services. The grid itself is covered in our MF ceilings and bulkheads guide.
Under a flat above, the ceiling is often the noisy side. Resilient bar ceilings we have fitted in flats have passed their sound tests. Our resilient bars guide explains how the bars hold the board off the joists to cut the vibration that carries sound.
What we check before the boards go up
These are the checks we make on our own jobs before any board goes up:
Backing for anything heavy. We fix plywood backing in stud walls wherever a TV, kitchen cabinets or a basin will hang, because it cannot be added once the wall is closed. See pattressing a metal stud wall and noggins.
The gap at a concrete slab. Where a partition meets a concrete slab overhead, the head gap is the one the structural engineer specifies, and we measure it again before boarding, so the slab can move without cracking the wall. Our deflection head guide shows how the top of the wall is built.
Cables and pipes. Positions are fixed and checked before boarding, and a registered electrician we arrange runs and tests the cables.
Stud centres to suit the board. Every vertical board edge needs a stud behind it. Our guide to stud wall spacing gives the centres for each board and finish.
How much does dry lining cost?
It depends on the method and on what is included. Our drylining cost per m² page gives typical ranges of £18 to £35 per m² for a dot and dab wall lining and £69 to £80 per m², plus VAT, for a standard metal stud partition. Taping, skimming and decorating are usually extra, so check what each price covers before comparing quotes.
Getting walls or ceilings dry lined
The first visit from our engineer, to see the walls and measure up, is free and commits you to nothing. Tell us which rooms, what the walls are made of, whether anything heavy will hang on them and whether they need insulation or sound separation. We then set out the method, board and finish wall by wall. Read more about us as drylining contractors in London, or send the rooms and a few photos to start.